22 Sept 2026 · Parsiya
Children and residents collect filtered water from the completed Project ARUNA community water point.
22 Sept 2026 · Parsiya
Residents fill containers at the community taps after the water point entered local use.
19 Sept 2026 · Parsiya, Palia
Front view of the completed Project ARUNA plant, including its sheltered community water taps and overhead storage tank.
19 Sept 2026 · Parsiya, Palia
The completed Project ARUNA plant in its village setting, beside the community entrance and solar streetlight.
19 Sept 2026 · Parsiya, Palia
The final front elevation of the completed treatment plant and covered water-collection point.
19 Sept 2026 · Parsiya, Palia
A side view showing the finished plant enclosure, secured equipment entrance, tank and sheltered taps.
19 Sept 2026 · Parsiya, Palia
The completed Project ARUNA plant viewed from the village approach, ready to serve the local community.
19 Sept 2026 · Parsiya
Local residents collect water from the taps at the newly completed treatment site.
18 Sept 2026 · Parsiya
Final preparation around the dispensing taps before regular community use.
18 Sept 2026 · Parsiya
The completed tap wall undergoing final checks at the Project ARUNA site.
13 Sept 2026 · Parsiya
The completed solar-powered site developed to treat arsenic and iron-contaminated groundwater.
13 Sept 2026 · Parsiya
The local construction team at the installation site.
13 Sept 2026 · Parsiya
FRP vessels, tanks, solar panels and pipework delivered for installation.
13 Sept 2026 · Parsiya
A video update from the official Project ARUNA YouTube channel.
8 Sept 2026 · Parsiya
The elevated raw-water tank and plant structure during installation.
1 Sept 2026 · Parsiya
Brick construction underway for the first Project ARUNA installation.
25 Aug 2026 · Parsiya
Boring work for the groundwater source at the installation site.
21 Aug 2026 · Parsiya
An early site visit at the village hand pump before construction began.